• Lockheed Martin | Building 158
    SBIRS SEIT SASC consisting of a complete demolition of the existing area, extensive electrical redesign, additional computer floor installation, HVAC modifications, smoke detection system, and state of the art AV integration.
  • Webex
    A sixty thousand square foot Design/Build project consisting of state of the art electrical, mechanical, architectural, data center computer room facility with UPS systems, and back-up generators.
  • Lockheed Martin | Building 202
    Relocated laborites consisting of a complete demolition of the existing area, extensive electrical redesign, electrical, architecture, and HVAC modifications.
  • Stanford Hospital
    Pods D & E Ground Conversion – Demolished existing and installed sheetrock walls, a T-bar ceiling, electrical and HVAC systems and flooring.
  • SCU | Athletic Facility
    Bathroom renovation project to building's interior.
  • SCU | Kenna Hall
    Dorm room upgrades consisting of window installation, bathrooms renovations, and HVAC.
  • Lockheed Martin | Building 159
    A five week critical completion project at the Satellite Test Chamber. H.D. Miller received the Lockheed Award for on-time completion.
  • SCU | Bannon Engineering
    Installed demountable & partition reconfiguration, electrical, exterior storefront modifications, and HVAC
  • Good Technology
    Created new desk and board area consisting of electrical, mechanical, and installation of new cubicles.
  • SCU | O'Connor Hall
    Renovation project consisting of electrical, HVAC, acoustical ceiling modifications to renovate several classrooms.
  • SCU | Bannon Engineering
    Converted two-room lab space into single room. Project included demolition, HVAC, electrical, mechanical, flooring, and painting.
  • SCU | Swig Hall
    Main elevator upgrade and modernization project.
  • Hewlett Packard | Building 6A
    The demolition of building 6A on the lower Palo Alto campus included making modification to the Anechoic Laboratory area.
  • SCU | Nobili Hall
    Installed new chiller plant, boiler water heater system, dorm room HVAC units. Project consisted of demolition, mechanical, roofing, painting and flooring work. Complete kitchen upgrade including cooking equipment, Ansul kitchen system, and freezer box.
  • Lockheed Martin | Building 152
    A EMI/EMC Design/Build Test Facility that consisted of a RF Shielded four room. welded enclosure complex that entailed the extensive detailed electrical, HVAC, mechanical, structural, Fire Detection System, and architectural design.
  • SCU | Heafy Law Library
    Converted storage space into multi-office staff space. Installed demountable walls, doors and hardware, T-bar ceiling, electrical, flooring, and roofing. Repaired existing HVAC system, added roof-top HVAC unit and structural support.